The Waste Water Division of the City of Two Rivers Public Works Department is responsible for the following:

  • Operate Waste Water Treatment Facility
  • Operate, Monitor and Maintain 19 Lift Stations
  • Operate Sludge Handling Facilities
  • Operate Laboratory
  • Conduct Mercury Reduction Program
  • Perform Confined Space entry in Plant and Collection System as Needed
  • Perform Sampling at Closed Landfill Facility

If you have any questions about the Waste Water Division, please contact the Waste Water plant at (920)793-5574.

 

2023 Screw Press Replacement
The Waste Water Department is in the process of replacing the 25+ year old belt press with a more efficient, cost saving sludge drying screw press.  The new press extracts the water from sludge before it is transported for land application.  The weight and volume of the "dry" sludge is less costly to haul than with our current belt press.  Also, with the new press there is less maintenance because of fewer moving parts.  See picture below of the installation.  The screw press should be operational in June, 2023.

4/24/23 update - The screw press was set in it's final location.  Next phase is piping installation and start up.

6/6/23 update - The new screw press has been installed and building restoration completed.  Start up has been delayed due to electrical component shipping issues.  Delivery has been tentatively set for September 2023.  The existing press will continue to be utilized until the electrical component is received and installed.

Click any thumbnail image to view a slideshow

Screw Press - 4/2023
Screw Press - 4/2023
Screw Press - 4/2023
Screw Press - 4/2023
Screw Press - 4/2023
Screw Press - 4/2023
Screw Press - 4/2023
Screw Press - 4/2023
Screw Press Set - 4/25/23